Geostud
 
   
 
  Geo studies
  Equipment
  Roads and bridges
  Civilian Constructions
  Slopes and versants stabilization
Roads and bridges

Illustrative works

Hydrological, hydrogeological and geotechnical study in Prahova’s major riverbed, regarding the foundation conditions for “Bucharest – Brasov Highway, Campina – Comarnic area”.
 
 


Field and laboratory studies to estimate the necessary soil reserves (filling) and ballast from the borrowing holes, placed along the “Bucharest - Brasov Highway”, Bucharest – Ploiesti area, km 0+000 - km 65+000.
 
 


Complex geotechnical and hydrogeological investigation programme for the design of the modernization and broadening of the 56A National Road, Maglavit – Simian, km 0+000 ÷ km 79+147, PT phase.
 
 


Hydrological, hydrogeological and geotechnical study in Siret’s major riverbed for “The new bridge on 24 National Road, Marasesti-Tecuci, km 7+620 over Siret River in Cosmesti, and by-pass of Cosmesti, Galati District”.
 
 

Other works:

  • Geotechnical study regarding the project ”Execution details on 6th National Road, km 233+200 ÷ 332+150”
  • Geotechnical and hydrogeotechnical study regarding the foundation condition for Sibiu – Deva Highway, Sibiu – Cunta area.
  • Preliminary geotechnical notification for “Moldova Highway”, Adjud – Bacau – Roman – Tg. Frumos – Sculeni area.
  • Geotechnical and hydrogeotechnical study in the Jiu ravine for “The 66th National Road’s rehabilitation, km 2+300 – km 131+000, Filiasi – Targu Jiu – Petrosani area”
  • Geotechnical and hydrogeotechnical study regarding the 56 National Road’s rehabilitation and broadening, Craiova – Calafat, Craiova – Giubega area, km 0+000 – 47+000, PT phase.
  • Geotechnical study for “402 contract, 2nd National Road crossing over the 500 Railroad main line, km 177+540”
  • Geotechnical study for “the railroad’s crossing over at Isalnita, km 238+608, the railroad’s crossing over at Cotofeni, km 247+743 and bridge over Valea Rea at Tatomiresti km 253+600”
  • Geotechnical study regarding the “5th National Road’s Express Rehabilitation, Bucharest – Giurgiu, km 7+600 – km 19+250, DDE phase”
  • Geotechnical and hydrogeological study in the Siret river meadow, regarding the alternative to by-pass Focsani using the 2nd National Road.
  • Hydrological, hydrogeological and geotechnical study in “Crisul Alb’s major riverbed, for Chisineu Cris by-passing, 79 National Road, km 38+000 – 43+000”
  • Geotechnical and hydrogeological study in the Cibin’s major riverbed and river meadow for Sibiu by-pass.
  • Geotechnical and hydrogeological study in the Bistrita’s major riverbed at the confluence with Siret River, regarding the Bacau by-pass.
  • Geotechnical and hydrogeological study in the Siret’s major riverbed at the confluence with Trotus River, regarding the Adjud by-pass.
  • Geotechnical and hydrogeological study in the Ramnicu Sarat’s major riverbed regarding the Rm. Sarat by-pass.
  • Geotechnical study regarding the Caracal by-pass.
  • Preliminary geotechnical notification regarding the Sannicolau Mare by-pass on 6th National Road
  • Geotechnical and hydrogeological study, including the crossing area of Niraj’s major riverbed, for Targu Mures by-pass, between 15 and 13 National Road.
  • Hydrological, hydrogeological and geotechnical study in Vedea’s major riverbed, regarding the Alexandria by-pass.
  • Geotechnical and hydrogeological study regarding the foundation conditions, including the crossing area of the Jiu’s major riverbed for the South – Craiova by-pass.
  • Geotechnical and hydrogeological study in Borcea Branch major riverbed (Danube Branch) regarding the 3B National Road rehabilitation, km 0+000 – km 3+020
  • Hydrological, hydrogeological and geotechnical study in Cerna’s major riverbed, for “The 67D National Road rehabilitation, km 100+000 – km 108+390, Cernei Valley – Herculane”
  • Geotechnical study for “The 56 National Road rehabilitation, Craiova – Calafat, km 0+000 – 82+020 area, SF phase”.
  • Geotechnical study for “The 18th National Road rehabilitation, Baia Mare – Sighetu Marmatiei, km 0+000 – 64+900 area”
  • Geotechnical study for “The 18th National Road rehabilitation, Sighetu Marmatiei – Iacobeni area, km 69+000 – 225+000”
  • Geotechnical study regarding “The road system consolidation - 25th National Road, km 0+000 – 68+130, Tecuci – Sendreni”
  • Geotechnical study for “The 2B National Road rehabilitation, Buzau – Braila, km 38+731 – km 103+200 area”.
  • Geotechnical study for “The 19th National Road rehabilitation, Oradea – Sighetu Marmatiei, Diosig – Sighet area, km 36+000 – km 234+000”
  • Geotechnical study regarding “The 67C National Road rehabilitation, Bengesti – Obarsia Lotrului area, km 0+000 – km 74+200”
  • Geotechnical study for “The road system rehabilitation - 1D National Road, Ciorani – Urziceni, km 17+500 – km 42+330”
  • Geotechnical study for “The 41 National Road rehabilitation, Oltenita – Daia, km 0+300 – km 64+385”
  • Geotechnical study regarding “The 28B National Road rehabilitation, Targu Frumos – Harlau – Botosani, km 0+000 – km 74+250”
  • Geotechnical study regarding “The 108 Communal Road metalling, Ghimpati – Camineasca, km 0+000 – 2+700”
  • Geotechnical study regarding “The 204EDistrict Road modernization and rehabilitation, km 24+200 – km 43+050 and 205R District Road modernization and rehabilitation, km 21+700 – km 28+700”
  • Geotechnical study regarding “The 6 Communal Road rehabilitation, Balotesti”
  • Geotechnical study for “The roads rehabilitation in SC ICME ECAB SA, Bucharest”
  • Geotechnical study regarding “The modernization of the 162 and 81 Communal Roads”
  • Geotechnical study regarding the Broscari Street rehabilitation, km 0+000 – km 1+055, connection street on Broscari dyke to Broscari Street, km 0+000 – km 0+206 and footbridge on Preotesti dyke, km 0+000 – km 0+273, Ilfov District”


  Geostud S.R.L. 2007  |  site map  
  Web design - Maniz Studio