|
|
Illustrative works
 |
Geotechnical and hydrogeological studies on the shore of Snagov lake, regarding “The foundation and water supply conditions for the construction of a pile of buildings and access road in Snagov, Ilfov District”. |
| |
|
 |
Geotechnical and hydrogeological studies in the major riverbed of Colentina River (right shore of Baneasa lake) regarding the foundation conditions for the work: “Offices building 2S+P+10E, Bucharest – Ploiesti Highway no. 7A”. |
| |
|
 |
Geotechnical study regarding the foundation conditions in the site located in Modrogan Street (S+P+4E) no. 4A, Bucharest. |
| |
|
Other works:
- Geotechnical and hydrogeological studies in the major riverbed of Colentina River (left shore of Baneasa lake) regarding the foundation conditions for the work: “Offices building 1S+P+4E, Bucharest – Ploiesti Highway no. 2A”.
- Geotechnical study regarding the foundation conditions for the work: “Offices building S+P+4E, Barbu Vacarescu Boulevard no. 313-321”.
- Geotechnical study regarding the foundation conditions for the work: “Inhabitable building S+P+4E, G. Calinescu Street no. 18, Bucharest”.
- Geotechnical study regarding the foundation conditions for the work: “Offices building S+P+6E, Polona Street no. 45, 1st sector, Bucharest”.
- Geotechnical study regarding the foundation conditions in the site located in Bucharest, Thomas Masaryk Street no. 12.
- Geotechnical study regarding the foundation conditions for the work: “Inhabitable building in Mogosoaia, Ilfov District”.
- Geotechnical study regarding the foundation conditions for the work: “Lukoil fuel station, Tr. Magurele Road no. 26-28”.
- Geotechnical study regarding the foundation conditions for the work: “Inhabitable building in Bucharest, Alexandriei Road no. 124”.
- Geotechnical study regarding the foundation conditions in the site located in Toma Caragiu Street no. 3, PiperaVillage, Voluntari, Ilfov District.
- Geotechnical study regarding the foundation conditions in the site located in Zborului Street no. 1, Otopeni, Ilfov District.
- Geotechnical study regarding the foundation conditions for the work: “Inhabitable building in Bucharest, Aricescu Street no. 5, 1st sector”.
- Geotechnical study regarding the foundation conditions for the work: “Premixtures factory located in Stefanesti, Ilfov District”.
|